Free meter installs. Smart by default.
Smart, half-hourly or standard, we install, configure and certify business meters across the UK at no cost when you switch your supply with us.
Smart meter (SMETS2)
Half-hourly readings, automatic billing, no manual reads.
- ✓Free install & commissioning
- ✓Half-hourly granularity
- ✓Works with all major UK suppliers
- ✓4–6 week typical lead time
Every business meter type, installed by certified UK engineers.
Smart meter (SMETS2)
Half-hourly readings sent automatically to your supplier. End of estimated billing.
- ✓SMETS2 certified
- ✓WAN-connected
- ✓In-Home Display included
Half-hourly (HH) meter
Mandatory for sites with 100+ kVA maximum demand. Detailed settlement data.
- ✓Profile class 5–8
- ✓Data collector & aggregator
- ✓Full HH data feed
Standard credit meter
Single or two-rate analogue meters for smaller business sites with stable demand.
- ✓Profile class 1–4
- ✓Quarterly meter reads
- ✓MPAN / MPRN registered
From request to certified install in 4–6 weeks.
Step 01
Tell us about your site
Postcode, business name and current supply, we identify your MPAN/MPRN automatically.
Step 02
We confirm meter type
Our engineers confirm which meter suits your load profile and arrange supplier sign-off.
Step 03
Engineer site visit
MOCOPA-accredited engineer installs the meter and commissions the WAN connection.
Step 04
Certified & live
Meter goes live, settlement registered, first half-hourly reads flow to your supplier.
MOCOPA-accredited. Free at the point of switch.
Our metering team is MOCOPA-accredited for HH and smart installations across England, Scotland and Wales. We co-ordinate with your DNO, MOP and supplier so you don't have to.
Book a site survey →£0
Install cost when you switch supply with us
4–6 wks
Typical end-to-end lead time
MOCOPA
Accredited for HH and smart installs
UK-wide
Engineers across England, Scotland & Wales
Meter installation questions, answered
Quick answers to the questions UK business owners ask us most.
Do I have to pay for a new meter?+
No. When you switch your supply through Scottish Prime Energy, the meter install is free, covered by your supplier as part of the contract.
Will my supply be interrupted during install?+
There's typically a 20–40 minute supply interruption while the engineer fits the new meter. We schedule it around your trading hours.
Can I keep my existing supplier and just upgrade my meter?+
Possible in some cases, your existing supplier may need to authorise the install. Our team can co-ordinate this for you.
What's the difference between SMETS2 and HH metering?+
SMETS2 is the UK's second-generation smart meter standard for smaller sites. HH (half-hourly) is mandatory for sites with 100+ kVA peak demand.
Upgrade your meter for free.
Smart, half-hourly or standard, MOCOPA-accredited engineers install at no cost when you switch your supply with us.
★ Trustpilot 4.8 / 5 · ★ Free to use · ★ 30-second switch
